Renovation Field Guide

Printable renovation checklists

Print them, put them on the wall, work down them. They are laid out so that the page breaks fall in sensible places.

An empty room with a stripped wooden floor, plain walls and daylight from tall windows.

A checklist earns its keep at the moments when something becomes permanent or expensive: before demolition starts, before a wall is boarded over, before the last payment leaves your account. These are written for those moments.

There are three, and they belong at three different points in the job. Before you start is the one to run while changing your mind is still free. Before the walls close is the last hour in which anything inside a wall can be checked without breaking something — it pairs with the order of operations, which explains why that hour matters so much. Snagging comes at the end, before the final payment, and reads best alongside hiring a contractor.

All three print on one or two pages. Print them. A checklist on a phone in a dusty room is a checklist nobody opens.