How the figures are worked out
Area. Each room is length × width × how many, all added together. Entering rooms as two dimensions rather than one area figure is deliberate: it lets the calculator give you the perimeter as well, which is what you need for skirting, beading and trim.
With waste. Area × one plus your waste percentage.
Packs. Area with waste divided by what one pack covers, rounded up. The pack coverage is printed on the label and is the number to use — board dimensions multiplied together will not match it, because of the tongue and groove.
Underlay. Net area divided by the roll coverage, rounded up. No waste allowance, because underlay butts together and offcuts are usable.
Perimeter. 2 × (length + width) for each room. Add about ten per cent for mitres and subtract your door openings.
What decides whether a floor lasts
Acclimatisation. Wood, engineered board and most laminates have to sit in the room they will be laid in, boxed and flat, for as long as the maker says — usually two to five days. The boards take up the room's humidity and settle at their final size. Lay them straight off the van and they move afterwards, which is how you get gaps in winter and buckling in summer.
The subfloor, not the floor. A floating floor telegraphs every hump. Most systems specify a tolerance — a maximum deviation over a two-metre straightedge — and meeting it with levelling compound before you start is far cheaper than discovering a soft spot under a finished floor. Over a concrete slab, moisture is the other question: a slab that reads damp needs a barrier, and screed needs weeks to dry, not days.
Expansion gaps. Every floating floor needs a gap at every wall and every fixed object, hidden by the skirting or beading. Butt a floating floor tight to a wall and it has nowhere to go, so it lifts in the middle. This is the single most common failure, and it is invisible until it is not.
Thresholds and door clearance. A new floor build-up is thicker than the old one more often than not. Check that internal doors still clear, that the front door still closes, and what happens where the new floor meets an old one in a doorway. Trimming a door is easy; discovering it after the floor is laid is annoying.
Where flooring sits in the job
Late. Near the end, after decorating, so that nobody is walking on it with tools and nobody is dripping paint on it. The exception is a kitchen, where the units usually go in first and the floor comes to meet them.
The one thing to do early is order it. Flooring is bulky, often made to order, and frequently on a four to eight week lead time — and it needs those acclimatisation days on site before it can be laid. Order it at the start of the job and store it in the room it belongs to.
Common questions
- How much flooring waste should I allow?
- Ten per cent for a straight lay in a simple rectangular room, fifteen for a diagonal lay or a room with several alcoves and door openings, twenty for herringbone or chevron. Long narrow rooms waste more than their area suggests, because every row needs a full board to start.
- Should I buy an extra pack?
- Yes, and keep it somewhere dry and flat. Floors get damaged — a dropped pan, a leak, a sofa leg — and a replacement board from a different batch will be a visibly different colour. One spare pack is cheap insurance against relaying a whole room.
- Which direction should the boards run?
- Usually the long way down the room, or towards the main source of daylight, both of which make the space read as larger and hide the joins. In a hallway, run them along the direction of travel. Across floor joists rather than along them if you are laying over a timber subfloor.
- Does flooring go in before or after the kitchen?
- Usually after the units are in, so the floor is not trapped under them and is not damaged during the fit. Check what your flooring's instructions say about expansion gaps around fixed units first, because some systems want to run underneath and some must not.