Build it from four lists, not one number
Labour, by trade. Separately, not as one lump sum. A single figure from a single contractor hides where the money is and makes quotes impossible to compare. Ask for the breakdown.
Materials, with ownership. For each item, who buys it. A contractor supplying materials usually adds a margin, which is fair — they carry the risk, the delivery and the returns. But "plus materials" and "including materials" are different quotes and you need to know which one you are reading.
The things that are not the work. This is the list that sinks budgets:
- Waste removal — skip or container hire, a permit if it stands on the street, tip fees. Renovations generate far more waste than anyone expects
- Deliveries, and whether the price is to the kerb or into the room
- Tool and plant hire
- Living costs: eating out with no kitchen, a hotel for the days with no water, laundry
- Furniture storage and moving
- Permits, inspections, certificates, an engineer's calculation
- Consumables: fixings, sealant, abrasives, blades, filler, tape, dust sheets
- Making good — the incidental damage that happens in a working house
Contingency. Separate, and not available for nicer taps.
Contingency is a line item, not an attitude
Ten to fifteen per cent on cosmetic work where nothing is being opened up. Twenty to twenty-five once walls are coming off, or in anything older.
What it actually pays for: rot under a bath, wiring that is not where the drawing says, a joist notched through by a previous owner, a delivery that arrives broken, a wall that turns out not to be where the plan shows it.
In a property over fifty years old the contingency is the most reliable line in the budget, in the sense that it is the one you can be most confident will be used.
Keep it visibly separate. A contingency folded into the main figure gets spent on upgrades in month one and is not there in month three, which is when it was needed.
Contingency in the programme, too
Budget slack in days as well as money. A timeline with no slack converts a two-day problem into a three-week delay, because every trade after it has to be rebooked around other people's jobs.
Comparing quotes
Three quotes, in writing, against the same written scope. If they are not quoting the same scope you are not comparing anything.
Read for what is excluded, not what is included. The exclusions are where the difference between quotes usually lives.
Check whether it is a quote or an estimate. A quote is a fixed price. An estimate is a guess that can grow, and in most places the distinction has legal weight. Know which one you are holding.
Ask how variations are priced before you need one. "We will sort it out" is how a budget becomes a negotiation.
Payment stages
Tie payments to completed phases rather than to dates: strip-out complete, first fix complete, boarding complete, and so on. Hold a final retention — a meaningful percentage — until the snagging list is cleared and the certificates are in your hand.
This is not distrust. It aligns everybody's interest in the last ten per cent of the job, which is the ten per cent that otherwise drifts.
Where to spend and where not to
Spend on what is buried or hard to change. Pipework, cabling, insulation, waterproofing, the subfloor, structural work. All of it is invisible, all of it is expensive to revisit, and all of it is where a failure is most costly.
Save on what is visible and swappable. Taps, handles, light fittings, paint colour, tile in a secondary room. These can be upgraded in five years for a fraction of what it costs to open a wall again.
That is the whole principle, and it is the opposite of how most budgets get cut under pressure.
Note on this site's figures
Nothing on this site tells you what work should cost. The budget planner adds up quotes you have obtained yourself. That is deliberate: a cost figure that is twelve months old is worse than no figure, because it is trusted.
Common questions
- Why will you not tell me what a bathroom costs?
- Because the honest answer is a range so wide it is useless, and a narrower answer would be wrong for most readers. Renovation prices differ by a factor of three between countries, vary by region, and move every year. Any figure published here would be out of date within months and believed anyway.
- How much contingency is enough?
- Ten to fifteen per cent for cosmetic work. Twenty to twenty-five once walls are being opened, or in any building more than about fifty years old. The older the property and the less you know about what is behind the surface, the higher the figure.
- Is the cheapest quote ever the right one?
- Sometimes, and you can only tell by finding out what is in it. A quote that is thirty per cent below the others is usually missing waste removal, making good, or materials — or it assumes you have done the preparation. Ask what is excluded before you decide it is a bargain.
- Should I pay a deposit?
- A deposit for materials on a specified order is normal. A large deposit for labour before any work has happened is not. Agree payment stages tied to completed phases, in writing, and hold a retention until snagging is signed off.
