Renovation Field Guide

Calculator

Renovation budget planner

Put in your real quotes. It applies a contingency, then tax, shows the total against your limit, and points at the line worth a second quote.

Your quotes and prices
On top
10–15% cosmetic, 20–25% opening up walls
0 if your quotes already include it
0 to skip

This planner runs in your browser and needs JavaScript switched on. It adds your lines, applies a contingency, then tax — in that order.

How the figures are worked out

Your lines are added together. The contingency percentage is applied to that subtotal. Tax is applied to the subtotal plus contingency. If you set a limit, the difference is shown.

That is all it does, and the restraint is the point.

What goes on the list

Most budgets come apart because of what is missing, not because a number is wrong. Work through these:

Labour, by trade, separately. One lump sum from one contractor hides where the money is and makes it impossible to compare quotes. Ask for a breakdown.

Materials, with who is buying them. A contractor supplying materials usually marks them up, and that is reasonable — they carry the risk and the returns. But you need to know which model you are in, because "plus materials" and "including materials" are different quotes.

The things that are not the work.

The decisions you have not made yet. Put a line in with your best figure anyway. A blank is a nought in your head, and nought is never right.

Reading the result

The planner tells you which line is the biggest share of the total. That is almost always the one worth a second quote, because a ten per cent saving on your largest line is worth more than cutting three small ones entirely.

If the total is over your limit, cut scope now. Scope cut at the planning stage costs nothing. The same cut made halfway through costs a return visit, a restocking fee, and the goodwill of whoever is standing in your hallway.

A word on quotes

Three quotes, in writing, for the same specified scope. If one is dramatically cheaper, that is information, not a bargain: find out what is missing from it. Usually it is waste removal, making good, or the assumption that you have already done the preparation.

A quote is a fixed price. An estimate is a guess that can grow. Know which one you are holding.

Common questions

Why does this not estimate what things cost?
Because any figure it gave you would be wrong. Renovation prices differ by a factor of three between countries, vary by region within a country, and move every year. A cost estimate that is twelve months old is worse than no estimate, because it is believed. Get three quotes and put the real numbers in here.
How much contingency should I set?
Ten to fifteen per cent for cosmetic work where nothing is being opened up. Twenty to twenty-five once walls are coming off, in anything older, or where you do not know the condition of what is behind the surface. In a property over about fifty years old the contingency is not padding — it is the most reliable line in the budget.
Should the contingency come before or after tax?
Contingency first, then tax on the whole thing. If you spend the contingency, you will pay tax on that spend too, so applying tax to the subtotal including contingency is the version that does not surprise you.
What do people forget to put in the budget?
Waste removal, deliveries, tool hire, somewhere to live or eat while the kitchen is out, storage for furniture, permit and inspection fees, and the small materials — screws, sealant, blades, filler — that quietly add up to a real number. Also the replacement cost of anything damaged in transit or on site.

Updated 2026-11-21